Existing Sign Foundation Verification
We review the condition of existing sign footings. We determine if the footings can carry a pylon or ground sign modification. We provide a letter to the City that confirms the footing condition, so the City can close the permit.
We search the records first. If the records do not prove the foundation, we dig and measure it, or we test it.
- Footing condition review
- Capacity for the new sign
- Letter to close permits
- Pylon, pole and ground signs
What we do
Review the condition of existing footings
We find the records, or we expose and measure the footing on site. We record the concrete, the anchor bolts and the base plate.
Determine if the footings are sufficient
We check the footing for the loads of the new or modified pylon or ground sign. The result is reuse, reuse with a modification, or replace.
Provide a letter to the City
We issue a sealed letter that confirms the footing condition. The City uses the letter to issue the permit for the new sign or to close an open permit.
When does a sign foundation need verification?
You need a verification when a new sign load goes on a foundation that the records do not prove.
New sign on an existing footing
A rebrand or a new tenant puts a new pylon or ground sign on the existing caisson. The new sign is often larger, heavier or taller, so the wind load on the foundation increases.
Reface or cabinet change
A new cabinet, a digital display or added tenant panels change the weight and the wind area. The examiner can ask for proof that the foundation carries the new loads.
Footing modification
You want to change the existing footing, for example with new anchor bolts or a larger pier cap. The engineer must know what is in the ground before the design starts.
Municipal request
The municipality wants to confirm that the footing agrees with the permit drawings, or the sign was built without an inspection. The City asks for an engineer's letter that confirms structural integrity.
Why re-sign jobs stop at the foundation
A pylon or ground sign foundation is below grade. The permit drawings show the design, but they do not prove what the contractor built. Records are often lost when a property changes owners or when the sign company closes.
Few sign companies know how to verify an existing foundation. The permit then stops at the examiner's first comment, or the client pays for a new foundation that the sign did not need.
Rouge Hill Consulting (RHC) manages the full verification. We find the records, book the locate and the hydrovac, attend the dig, do the structural check and stamp the letter. The letter goes into the sign permit application with the rest of the submission.
How we verify an existing sign foundation
Records search
We search the municipal building file and the owner's records for these documents:
- Permit drawings for the original sign and its foundation.
- Engineer's field review reports from the original installation.
- Concrete delivery tickets and test reports.
If the records prove the size and the depth of the foundation, we go to the structural check. No site work is necessary.
Private locate and hydrovac
If the records do not prove the depth, we book a private utility locate and a hydrovac slot. The private locate marks the buried lines that the property owns, such as the sign power feed and the site lighting cables. The public utility locates must also be complete before the dig.
Dig and measure
We attend the dig. The hydrovac exposes the side of the caisson, and we measure it:
- Diameter and depth of the caisson.
- Condition of the concrete.
- Anchor bolts and base plate.
We record each measurement with photos for the engineering file.
PIT or GPR, when a dig is not practical
A dig is not always practical, for example under paving, near utilities or at a deep caisson. We then schedule and coordinate a test:
- Pile Integrity Test (PIT): a small hammer impact on the top of the caisson. The test estimates the length and the continuity of the concrete.
- Ground Penetrating Radar (GPR): a radar scan that finds the reinforcement and the edges of the concrete.
Structural check and sealed letter
We check the caisson for the new sign loads to the Ontario Building Code (OBC) Part 4: wind, dead load, overturning, soil resistance, anchor bolts and base plate. Then we issue a sealed letter with one of three results.
The sealed letter: three results
The letter goes with the sign permit application.
Reuse
The existing foundation carries the new sign loads. The letter confirms this, and the new sign goes on the existing caisson.
Reuse with a modification
The foundation needs a change, for example new anchor bolts or a larger pier cap. We design the change and stamp the drawings.
Replace
The foundation cannot carry the new sign, or its condition is poor. We design a new foundation and stamp the drawings.
If the foundation needs a modification or a replacement, the stamped design goes into the same sign engineering package and the same permit application.
What we need to start
- The project address.
- Photos of the existing sign, with a close-up of the base.
- Drawings of the new sign: size, height, weight and mounting.
- Any records that you have: the old permit number, drawings or invoices from the installer.
- A site contact for access on the day of the dig.
Send these to projects@rougehillconsulting.com or call +1 (437) 833-7817. We confirm the scope and send a fixed-fee quote.
Frequently asked questions
Can I reuse an existing pylon sign foundation?βΎ
Yes, if the structural check confirms that the foundation carries the new sign loads. The check needs the size and the depth of the foundation, from the records or from a site measurement.
How do you find the depth of an existing sign caisson?βΎ
First, we search the permit drawings, the field review reports and the concrete tickets. If the records do not prove the depth, a hydrovac exposes the caisson and we measure it. When a dig is not practical, a Pile Integrity Test (PIT) or a Ground Penetrating Radar (GPR) scan is the alternative.
Does a sign reface need a foundation check?βΎ
Not always. A new face in the same cabinet does not change the loads. A larger or heavier cabinet, a digital display or a taller sign changes the loads, and the foundation then needs a check. Many rebrands change the cabinet.
What does the sealed letter say?βΎ
The letter gives one of three results: reuse the foundation, reuse it with a modification, or replace it. For a modification or a replacement, we also stamp the design drawings.
The City says my sign was built without an inspection. What do I do?βΎ
The City can ask for an engineer's letter that confirms the structural integrity of the sign. We verify the foundation, review the structure above grade and issue a sealed letter for the City.
Who books the locate and the hydrovac?βΎ
We do. We book the private locate and the hydrovac slot, and our engineer attends the dig. You give us site access.
Related services
We coordinate the foundation verification with these services.
Need an existing sign foundation verified?
Reach out to us directly
projects@rougehillconsulting.com
+1 (437) 833-7817
Headquarters in Toronto, ON.
Operating Canada-wide.