Signage Master Plans for Multi-Sign Properties
One approval sets the sign rules for a whole plaza, campus or tower. Tenants then get sign permits against the plan.
We prepare Signage Master Plans in Toronto, Sign Uniformity Plans in Markham, Comprehensive Sign Plans in Vancouver and the equivalent plan in other Canadian municipalities.
- Former City of Toronto sign examiner
- P.Eng. and BCIN
- Any Canadian city
What is a Signage Master Plan?
A Signage Master Plan is a set of drawings and written rules that controls every sign on one property. It sets the location, type, size, materials and illumination of each sign. The municipality approves the plan once. After approval, each sign gets a sign permit that agrees with the plan.
Municipalities use different names for this approval. Toronto calls it a Signage Master Plan. Markham calls it a Sign Uniformity Plan. Vancouver calls it a Comprehensive Sign Plan. The purpose is the same: one coordinated sign package for a property with many signs or many tenants.
Who needs a Signage Master Plan?
- Shopping centres and retail plazas. Fixed sign zones for every tenant unit, plus pylons and directional signs.
- Mixed-use towers. Retail signs at grade, and building identification for the office, hotel or residential floors above.
- Campuses. Hospitals, universities and corporate campuses with building signs, ground signs and wayfinding.
- New developments. Plan the signs with the building, before tenants arrive.
- Rebrands. Replace many signs on one property at the same time.
- Sites with non-compliant signs. When several signs need relief from the sign by-law at once.
Signage Master Plan types by municipality
Each plan type has its own trigger, content and approval. We check the current by-law for each project.
Signage Master Plan
Toronto, Ontario Β· Chapter 694Toronto Municipal Code Chapter 694 defines a Signage Master Plan as a submission with drawings, text and specifications that sets the location, arrangement, type and design of signs on premises within a defined area. In Toronto, it is the variance route for a group of signs.
- Required when a variance relates to three or more signs, a roof sign, an electronic roof sign, a projected image sign, or premises that already have an approved plan (s. 694-30B(2)).
- Roof signs: a first-party roof sign is permitted only in a plan that contains first-party signs only (s. 694-15B).
- Who decides: Sign By-law Unit staff for first-party plans. The Sign Variance Committee for plans with third-party signs. Appeal to the Sign Variance Committee within 20 days.
- Notice: a notice on the site for at least 30 days, and mailed notice within 120 m (250 m with electronic signs).
- 2026 City fee: $3,324.35 for each application. Signs installed before the application add $963.71 for each sign face.
Read the full guide: Signage Master Plan Toronto: SMP vs Sign Variance. Official page: City of Toronto Signage Master Plan.
Sign Uniformity Plan
Markham, Ontario Β· Sign By-law 2002-94Markham's Sign By-law defines a Sign Uniformity Plan as drawings and specifications for all wall signs on a building with more than one occupancy, or for all hoarding signs. The plan shows the arrangement, type, character, height and design of each sign in relation to the architecture of the building.
- Required with the sign permit application when the premises has more than one occupancy and the lands are under site plan control, or when wall signs are proposed above the first storey (s. 4.5.1). Hoarding signs also need a plan (s. 4.5.2).
- Shopping centres: on sites of 1.0 ha or more, all wall signs must follow the approved plan (Table B).
- Tenant sign area: if the plan does not allocate sign space, each tenant's wall sign area is in proportion to its frontage (s. 5.4.7).
- Limits: the plan does not increase the maximum sign areas in the by-law. More area needs a separate sign variance (s. 19).
- Who decides: the City, through the Building Standards Division with the sign permit application.
Official source: Markham Sign By-law 2002-94 (consolidated).
Comprehensive Sign Plan
Vancouver, British Columbia Β· Sign By-law No. 11879Vancouver regulates signs on private property through its Sign By-law. We prepare coordinated sign plans for new developments, shopping centres and multi-building sites in Vancouver, where the signs must work as one system.
- Before we draw, we confirm the current Sign By-law requirements, the review path and the City fee for the site.
- The plan sets the sign zones, sign types, sizes and illumination for every building on the site.
Official source: City of Vancouver Sign By-law.
Other multi-sign plans in Canada
London Β· Edmonton Β· Calgary Β· Surrey- London, ON: Signage Master Plan. The City can ask for a plan before it issues sign permits when a premises has more than one occupancy or is under site plan control. The owner signs a Letter of Acknowledgement (Sign By-law S.-5868-183, s. 4.4). Source.
- Edmonton, AB: Comprehensive Sign Design Plan. A development permit required on MU and MUN sites, and some CN sites, for redevelopment, a new building or facade changes. All later sign permits must follow it. The 2026 fee line is $415 (Zoning Bylaw 20001, s. 6.90). Source.
- Calgary, AB: Comprehensive Sign Program. A development permit condition that sets the areas for wall, projecting and freestanding signs. These areas replace the normal location and area rules (Land Use Bylaw 1P2007, s. 70). Source.
- Surrey, BC: Comprehensive Sign Design Package. Submitted with a development permit. Council can approve sign variances in the development permit, without a separate Development Variance Permit (Sign By-law No. 13656, s. 9). Source.
Compare the plan types
| Plan | Municipality | When it applies | Relaxes the by-law? | Who approves |
|---|---|---|---|---|
| Signage Master Plan | Toronto | Variance for 3 or more signs, roof, electronic roof or projected image signs | Yes, as a variance | Staff (first-party) or Sign Variance Committee |
| Sign Uniformity Plan | Markham | Multi-tenant sites under site plan control, wall signs above the first storey, hoarding signs | No, area relief needs a variance | City, with the sign permit |
| Signage Master Plan | London | At the City's request: multi-occupancy or site plan control | Not stated | Chief Building Official |
| Comprehensive Sign Design Plan | Edmonton | MU, MUN and some CN sites with new buildings or facade changes | No | City, by development permit |
| Comprehensive Sign Program | Calgary | When the Development Authority requires it | Replaces area and location rules | Development Authority |
| Comprehensive Sign Design Package | Surrey | With a development permit application | Yes, Council can vary it | Council |
Each by-law changes over time. We confirm the current rules with the municipality for each project.
What a Signage Master Plan includes
- Sign inventory. Every existing sign, with its size, location and permit status.
- Site plan. The location of each ground sign, pylon and directional sign, with setbacks.
- Elevations with sign zones. The area on each facade where each tenant may place a sign.
- Sign types and sizes. Maximum area, height, letter height and projection for each sign type.
- Design criteria. Materials, colours, illumination method and brightness, and mounting details.
- By-law compliance analysis. Each rule the plan meets, and each rule where the plan needs relief.
- Rationale. Why the plan fits the property, the Official Plan and the street.
- Tenant instructions. A short guide that tenants and sign companies follow for future sign permits.
How we prepare your plan
Site audit
We visit the property, list every sign and check the permit records. We confirm the sign district or zone.
By-law review
We do a Sign Code Check on the existing and proposed signs, and confirm which plan type the municipality requires.
Draft plan
We prepare the drawings and the written criteria. You and your architect review the sign zones and the design rules.
Application and review
We file the plan, pay the fee on your behalf, manage public notice where required and answer staff comments.
Approval and sign permits
After approval, we prepare the sign permits for each sign, with engineering where the building code requires it.
Signage Master Plan or sign variance?
Use a sign variance for one or two signs that do not comply. Use a Signage Master Plan when many signs on one property need relief, or when the by-law requires a plan for the property.
In Toronto the choice is in the by-law: a variance for three or more signs, a roof sign, an electronic roof sign or a projected image sign must be a Signage Master Plan. A plan also costs less over time on a multi-tenant property, because new tenants follow the approved rules and do not need a new variance. For single signs, see Sign Variance.
Frequently asked questions
What is a Signage Master Plan?βΎ
A Signage Master Plan is a set of drawings and written rules for every sign on one property. It sets the location, type, size, materials and illumination of each sign. The municipality approves the plan once, and each sign then gets a sign permit that agrees with it.
When does Toronto require a Signage Master Plan?βΎ
Toronto requires a Signage Master Plan when a variance relates to three or more signs, a roof sign, an electronic roof sign, a projected image sign, or premises that already have an approved plan (Chapter 694, s. 694-30B(2)). The 2026 City fee is $3,324.35.
What is a Sign Uniformity Plan in Markham?βΎ
It is a set of drawings and specifications for all wall signs on a multi-tenant building, or for all hoarding signs, under Markham Sign By-law 2002-94. You submit it with the sign permit application when the site has more than one occupancy and is under site plan control, or when wall signs are above the first storey.
Does a Signage Master Plan let my signs exceed the by-law?βΎ
It depends on the municipality. A Toronto Signage Master Plan is a variance, so it can permit signs that do not comply. A Markham Sign Uniformity Plan and an Edmonton Comprehensive Sign Design Plan coordinate the signs but do not increase the limits. Extra sign area then needs a separate variance.
Do tenants still need sign permits after the plan is approved?βΎ
Yes. Each sign needs a sign permit. The approved plan makes the permit faster, because the examiner checks the sign against clear rules for that property.
Who should apply for a Signage Master Plan?βΎ
The property owner or its agent applies, because the plan controls all the signs on the property. Landlords of plazas, shopping centres, campuses and mixed-use towers use it to keep tenant signs consistent.
Related services
Ready to plan the signs for your property?
Reach out to us directly
projects@rougehillconsulting.com
+1 (437) 833-7817
Headquarters in Toronto, ON.
Operating Canada-wide.
