Facility Alteration Permits (FAP) at Toronto Pearson Airport
We prepare, seal and manage the GTAA approvals for your activation, pop-up, sign or interior alteration at Toronto Pearson.
One team for the Facility Alteration Permit (FAP), the Pearson Airport Work Authorization (PAWA), terminal work, event and film permits, and closeout.
- Licensed Professional Engineers in Ontario
What is a Facility Alteration Permit?
A Facility Alteration Permit (FAP) is the written approval that the Greater Toronto Airports Authority (GTAA) issues before construction or an alteration starts at Toronto Pearson. The Construction Compliance & Permits Office (CCPO) issues it. The CCPO is the authority having jurisdiction for construction on airport lands, and it reviews designs to the National Building Code and the National Fire Code of Canada.
The GTAA FAP Application Preparation Guide lists the work that needs a FAP. The list includes leasehold improvements for tenant premises, new interior finishes, fixtures and furniture, furniture or equipment that needs on-site assembly or a connection to building systems, and new, modified or relocated signs and graphics in any area. No construction can start before the CCPO issues the FAP.
The FAP is one approval in a sequence. Tenant coordination, design reviews, the PAWA work authorization and the closeout inspection come before and after it. We manage the full sequence for you.
Projects we take through GTAA approval
Activations and pop-upsBrand activations, retail pop-ups and seasonal installations in the terminals. We check the fixtures for overturning, design the construction protection and get the FAP, terminal work and event approvals.
Signs and graphicsNew, modified or relocated tenant signs, digital displays and graphics. Sign permits are our core service. We prepare the sign drawings, check the structure and attachment, and seal the drawings.
Interior alterations and kiosksKiosks, millwork, finishes and leasehold improvements for concession and tenant spaces. We coordinate the architect and electrical engineer when the scope needs them, under one drawing set.
Licensed Professional Engineers for GTAA submissions
The GTAA requires FAP drawings and specifications that are sealed and signed by an architect or engineer registered in the Province of Ontario. Our engineers are Professional Engineers (P.Eng.) licensed by Professional Engineers Ontario. We prepare the engineering, seal it and stay responsible for it until closeout.
- Sealed issued-for-construction drawings. Structural design of fixtures, kiosk frames, hoarding and sign supports.
- General Review Commitment Certificate. The GTAA asks for a sealed and signed certificate for each professional discipline. We sign ours.
- Code review. We check the design against the National Building Code, the Airport Construction Code and the GTAA Tenant Design Standards before the CCPO sees it.
- Field review and closeout. We review the installation on site, issue our field review letter and hand over the final documents for the Occupancy/Use Permit.
Each discipline seals its own work. If your project needs an architect or an electrical engineer, we bring them in and coordinate their sheets with ours, so the GTAA gets one complete set.
GTAA permits and approvals we manage
Since the GTAA launched PAWA, terminal work, event and film requests go through one Work Authorization. Many people still call them the Terminal Work Permit (TWP), the Terminal Event Permit (TEP) and the Terminal Film Permit. The FAP stays a separate process with the CCPO.
| Approval | What it covers | Lead time the GTAA states |
|---|---|---|
| Facility Alteration Permit (FAP) | Construction and alterations: activations, kiosks, signs, finishes, fixtures, leasehold improvements. Issued by the CCPO. | The CCPO targets 5 to 10 business days for its reviews of a complete submission. Complex projects take longer. |
| QuickFAP | Work that does not need a code review. Only the contractor's safety review applies. | Set by the CCPO for each request. |
| PAWA: Terminal Work (TWP) | Construction or maintenance in a terminal or baggage area. | 5 business days. 14 business days if the work affects Canada Customs, US Customs or CATSA. |
| PAWA: Events (TEP) | Launch events, receptions, celebrations, surveys and tours. | 20 business days. 45 business days if Transport Canada approval is needed. |
| PAWA: Film and Photography (Terminal Film Permit) | Commercial (non-news) filming and photography. | 20 business days processing time. |
| PAWA: Shutdowns | Utility outages, for example an electrical shutdown to connect new circuits. | Set in PAWA for each request. |
| Occupancy/Use Permit | Final inspection, final documents and as-built drawings. The CCPO then lets you use the space and closes the FAP. | Request the final inspection with 5 business days' notice. |
Sources: the Toronto Pearson PAWA page and the GTAA FAP Application Preparation Guide.
The Pearson approval process, step by step
This is the sequence we followed to get a FAP and PAWA approval for a retail activation in Terminal 1. Your scope can add or remove steps.
Scope meeting and site visit
We meet the GTAA tenant coordinator and the landlord-operator for your space. We visit the site, confirm the lease boundary and request the base building drawings from the GTAA.
Design and code review
We prepare or review the drawings against the National Building Code, the Airport Construction Code and the Tenant Design Standards. You approve the design before it goes to the GTAA.
GTAA stakeholder review
The GTAA reviews the design set and sends comments. We answer each comment and issue the revised set.
Sealed issued-for-construction drawings
We seal the final set. The GTAA wants one complete set, not single sheets.
FAP application package
We assemble the package and email it to the CCPO:
- FAP Application for Airport Construction form.
- Sealed drawings, specifications and General Review Commitment Certificates.
- Tenant Letter of Undertaking.
- Contractor Site Specific Safety Plan, Ministry of Labour Form 1000 and Notice of Project where they apply.
- Material specification sheets and a key plan.
Code and safety reviews
The CCPO's independent code consultant reviews the design for fire protection and life safety. The independent safety consultant reviews the contractor's plan to Part 7 of the Airport Construction Code. We answer the code comments and help your contractor close the safety items.
FAP issued, PAWA in parallel
The CCPO issues the FAP when the reviews are complete and the fee is paid. We submit the PAWA terminal work, event and film requests so that the install dates are approved.
Installation and field review
Your contractor installs the work in the approved window. We review the installation on site.
Final inspection and closeout
We send the signed Request for Final Inspection with 5 business days' notice and hand over the final documents and our field review letter. The CCPO issues the Occupancy/Use Permit and closes the FAP after the GTAA accepts the as-built drawings.
Why Pearson approvals get delayed
- Incomplete FAP package. The CCPO delays the review until each section of the form and each document is in.
- Seal on the wrong set. The seal goes on the final issued-for-construction set, after the GTAA comments are closed.
- Construction protection not shown. Barriers, hoarding and bilingual warning signs must meet the Airport Construction Code.
- New power or floor penetrations. New circuits, coring and firestops add reviews, a shutdown request and closeout documents.
- Government agency impact. Work that affects customs areas or CATSA needs 14 business days for the terminal work request.
- Changes after approval. A change to the layout, systems or materials needs a FAP amendment before the work.
- Insurance certificate not ready. Event and film requests need the GTAA's insurance limits and named insureds.
Why brands and tenants use RHC at Pearson
Licensed engineers, in-houseOur P.Eng. seals the engineering. You do not hire a separate engineer and wait for a second schedule.
One point of contactThe tenant coordinator, the CCPO, the code and safety consultants, your contractor and your landlord. We track each one and report to you.
Fixed scope at the quoteWe define the deliverables and the approvals in the quote, so you know what you get.
Frequently asked questions
What is a Facility Alteration Permit (FAP) at Toronto Pearson?βΎ
A FAP is the GTAA's written approval for new construction and alterations to buildings and facilities at Toronto Pearson. The Construction Compliance & Permits Office (CCPO) issues it. Work cannot start before the FAP is issued.
Does a pop-up or brand activation at Pearson need a FAP?βΎ
Usually yes. The GTAA's list of work that needs a FAP includes new fixtures and furniture, and furniture or equipment that needs on-site assembly or a connection to building systems. Work that does not need a code review can qualify for a QuickFAP, with a contractor safety review only. We confirm the route with the CCPO at the start.
Do signs at Toronto Pearson need a permit?βΎ
Yes. The GTAA lists new, modified or relocated signs and graphics in any area as work that needs a FAP. The drawings must be sealed by an architect or engineer registered in Ontario.
What is PAWA at Pearson Airport?βΎ
PAWA is the Pearson Airport Work Authorization, the GTAA's single tool for airport work requests. It covers terminal work, events, film and photography, shutdowns, airside and groundside work, cranes and security impacts. PAWA does not process FAPs.
How long does a FAP take?βΎ
The CCPO targets 5 to 10 business days for its reviews of a complete submission. The design reviews before the FAP, the code comments and the contractor safety review add time. In our experience, plan for months from the first scope meeting for an activation, and set the opening date with that in mind.
Who can apply for a FAP?βΎ
The project owner, its representative, a consultant or the contractor can submit the application. The drawings must be sealed by an architect or engineer registered in Ontario. We apply as your consultant and seal the engineering.
How far ahead must I apply for terminal work, an event or filming?βΎ
The GTAA asks for terminal work requests at least 5 business days ahead, or 14 business days if the work affects customs or CATSA. Event requests need at least 20 business days. Film and photography requests take 20 business days to process.
What insurance do I need for an event or film permit at Pearson?βΎ
The GTAA asks for commercial general liability insurance of at least $2,000,000 for each occurrence, or $10,000,000 if airside. The GTAA and His Majesty the King in Right of Canada must be named as additional insureds.