A sign variance in Markham, ON gives approval for a sign that does not meet Sign By-law 2002-94. Markham City Council decides under section 19 of the by-law, after a hearing and a recommendation at the Development Services Committee. The 2026 application fee is $705.
Our principal, Irteza Ahmed, P.Eng., worked at the City of Toronto as a building plans examiner and reviewed sign permit applications.
This guide summarizes section 19 of the Markham Sign By-law 2002-94 (consolidated to April 2024) and the 2026 fees in the Licensing, Permit and Service Fees By-law 2012-137. For the basics, read what is a sign variance.
When do you need a sign variance in Markham?
Section 4.3.1 of the Sign By-law requires a permit before you erect, display or alter a sign on private property, except for the signs in section 4.6. Section 4.3.3 lets the City refuse a permit for a sign that does not comply. A sign variance under section 19 gives relief from one or more provisions.
These rules often cause a Markham sign variance in a commercial zone:
- Wall sign area: Table B allows 0.75 m² for each 1.0 m of linear building facade, with a maximum of 35.0 m² for one sign.
- Upper-storey wall signs: On an office building of three or more storeys, Table B allows wall signs only on the first storey, the top storey and parapet, or the mechanical penthouse. On a two-storey commercial building, a second-storey wall sign must follow a sign uniformity plan that the City approved.
- Projection: A wall sign cannot project more than 0.5 m from the wall (section 5.4.2).
- Ground signs: Table B allows 4.0 m² per face and 4.0 m in height on a lot with 20 m of frontage or less, and 6.0 m² per face and 7.5 m on a wider lot. Section 5.3.9 allows one ground sign for each street frontage. Section 5.3.7 keeps ground signs 15.0 m from a traffic light.
- Light sources: Section 5.1 requires shielded light sources that people cannot see from off the property.
- Heritage districts: In a Special Sign District, Heritage Markham reviews each sign permit application (section 10.2.1). Table E sets smaller limits. For example, a wall sign outside Main Street, Unionville can have 0.30 m² for each 1.0 m of facade, to a maximum of 5.0 m².
Section 4.5.1 also requires a sign uniformity plan with the permit application in two cases: wall signs above the first storey, and new or enlarged multi-tenant buildings under site plan control.
Council made the Sign By-law under the Municipal Act. So the route is a sign variance under section 19, not a Committee of Adjustment minor variance under the Planning Act.
A sign code check tells you which provisions your sign does not meet before you order fabrication.
Who decides a sign variance in Markham?
Markham City Council decides. Section 19 sets these steps:
- The Commissioner of Development Services prepares a report for the Development Services Committee. The report gives the reasons for the variance and a recommendation to Council (section 19.2).
- The Development Services Committee holds a hearing. It can recommend the variance if the general intent and purpose of the by-law stay in place (section 19.4).
- Council can uphold or vary the Committee’s recommendation. It can also make any decision that it could make after its own hearing (section 19.6).
Section 19.5 lists four matters that the Committee and Council must consider:
- Special circumstances: conditions that apply to the land, the building or the use.
- Hardship: whether strict application of the by-law causes practical difficulties or unnecessary and unusual hardship.
- Cause: whether the conditions existed before, and whether the owner or applicant created them.
- Area character: whether the sign changes the essential character of the area.
How to apply for a sign variance in Markham
- Identify each Sign By-law provision that the sign does not meet.
- Get the owner’s written authorization if you are not the owner. Section 4.4.5(b) requires it for the sign permit.
- Prepare the drawings. Show the location, dimensions and materials of all existing and proposed signs, and a site plan with the street and the property lines (section 4.4.5). Our sign permit drawings service prepares these.
- Write a letter that answers each matter in section 19.5.
- Apply on the City’s form and pay the $705 fee (section 19.1). The by-law does not name the form. Ask the Building Standards Department for the current form. It issues the permits for permanent signs (section 4.2(a)).
- Attend the Development Services Committee hearing. The Clerk tells you the date. If you do not attend, the Committee can proceed, and you get no further notice (section 19.3).
- Get the sign permit. A variance does not replace the permit that section 4.3.1 requires. Make the permit drawings agree with the decision.
The City’s ePLAN Quick Reference for signs lists the permit forms and drawings. An architect or professional engineer must prepare the drawings for some signs, for example a wall sign heavier than 115 kg.
Markham sign variance fees
| Item | 2026 fee | Source |
|---|---|---|
| Sign By-law Variance | $705.00 | By-law 2012-137, Schedule B |
| Permanent sign permit, sign not regulated by the Building Code | $276.50 | By-law 2012-137, Schedule B |
| Sign regulated by the Building Code | $449 each | Building By-law 2025-121, Schedule A |
By-law 2012-137 sets the Sign By-law fees. The City’s building permit fee schedule shows the Building Code fee for applications submitted after December 31, 2025.
Public notice, decision and appeal
- Notice: Section 19 sets no notice to neighbours. The Clerk tells the applicant the hearing date (section 19.3).
- Decision: Council makes the decision. You are not entitled to a further hearing before Council (section 19.6).
- Appeal: The by-law gives no appeal. The Council decision is final (section 19.6).
The Sign By-law sets no time limit for a decision. The time depends on the staff report, the Committee hearing date and the Council meeting date.
How to improve your chances of approval
- Show a special circumstance. Use photos and drawings to show the condition of the land, the building or the use that makes the by-law hard to meet (section 19.5(a)).
- Show you did not cause it. The Committee asks if the condition existed before and if the owner or applicant created it (section 19.5(c)).
- Keep the request small. Ask only for the relief you need. Show that the intent of the by-law stays in place (section 19.4).
- Protect the area character. Match the sign to the building and the street, and shield the light sources (sections 19.5(d) and 5.1).
- Plan all signs at once. Upper-storey signs and some multi-tenant sites need a sign uniformity plan (section 4.5.1). A signage master plan helps on large sites.
We compare Markham with other cities on our sign variance page. Also read our Brampton sign variance guide and our Toronto sign variance guide.
Need help with a sign variance in Markham?
Rouge Hill Consulting prepares Markham sign variance applications, rationale letters and drawings. Send the address, the sign drawings, site photos and any City comments through our contact page. We reply within one business day. See our sign variance services and our sign permit services.